BräuPro Homebrewing - Two-Vessel Electric Brewing & Fermentation System
Product · BräuPro · Pilot & Nano · 1 BBL

BräuPro 1 BBL - Two-Vessel Electric Brewing & Fermentation System

Two-vessel electric brewing system with a 40-gallon jacketed conical Unitank and 50-gallon DrainPro mash tun. For advanced homebrewers and small-batch professionals brewing 10–32 gallons of finished beer per batch.

Est. 2014
✓
Made to order · ships in 3–10 days from our Vancouver, BC workshop. Free shipping to the lower 48. Live commissioning call included.

A complete 1 BBL two-vessel brewing system — dedicated mash tun + 40 gallon jacketed Unitank fermenter — turnkey for nano breweries, taprooms, and pilot operations producing finished beer at commercial pace.

The Unitank heats all the water, boils the wort, then ferments and carbonates the batch and pressure-transfers it to keg; a counterflow chiller chills the wort after the boil. The mash tun holds the mash and sparge. One 5.5 kW (5,500 W) element on 240V single-phase, on a 30A circuit, drives the hot side, and a single brew pump moves the wort. Standard tri-clamp fittings throughout — same architecture as our homebrew BräuPro, scaled for commercial duty cycles.

For brewers crossing from homebrew to first commercial batches, or operations producing finished beer at a pace that matters. Designed and assembled in Vancouver, BC. Usually ships in 5 to 10 business days.

$7,049.00 USDShips from Vancouver, BC
US delivered price. Nothing more to pay.
  • Tariffs paid
  • Duties & customs paid
  • Free shipping

Ships free to the lower 48. We clear customs and prepay every US tariff, duty and brokerage fee, so it arrives like a domestic parcel. If anyone asks you for one at delivery, we pay it. How it works

→
Made to order · ships in 3–10 days from Vancouver, BC
2y
2-year warranty on stainless · 1 year on electronics · lifetime parts
✉
Talk to a brewer, not a sales rep · email or call — real humans

Plug the element in all the way and twist to lock. A twist-lock plug that's only part-way in can overheat and melt the connection. See how (5-second video) →

Not sure this is the right system? Take the 30-second quiz →

Built for

The bridge from homebrew to pro. not around compromises.

01 · Scaling up

Advanced homebrewers scaling up

Already maxing out a 20G? The 1 BBL doubles your batch with the same workflow, plus a proper jacketed conical for repeatable fermentation across every style.

02 · Pilot operations

Small-batch pros & pilot brewers

Kombucha, mead, hard seltzer, or pilot beer R&D. A real commercial-grade two-vessel setup at a price that still works for a startup or side project.

03 · Nano taproom

Nano taprooms testing the waters

Pour your own beer alongside guest taps. Two batches a week sustains a single house line — enough to prove demand before scaling to 3–5 BBL.

Step 1 — System tier

Base or Complete?

Base ships with everything you need to brew + ferment — vessels, element, controller, pump, full tri-clamp hardware, tap-water cooling. Complete adds the five accessories most BräuPro owners buy in the first six months. Buying the kit saves $200 versus picking these up individually later.

Step 2 — Wort knockdown

How will you cool wort to pitch temp?

A counterflow chiller is required for the cold side. The Unitank jacket holds fermentation temp; it doesn't knock down boiled wort.

Step 3 — Fermentation cooling

How will you hold fermentation temp?

BEF-02 runs your 1 BBL Unitank on its own. BEF-05 adds multi-pump and 67-gal reservoir support — the upgrade path as you grow.

Optional — stand

Add a brew table?

Welded stainless table sized to the 50-gallon mash tun, with the pump and plumbing mounted underneath.

How BräuPro works

Two vessels. One complete process.

DrainPro mash tun + jacketed conical Unitank. Wort recirculates through the mash bed, drains to the Unitank for boil, chills through the jacket, and ferments in place — all standard tri-clamp.

Step 1

Heat strike water

The Unitank's element heats strike water to mash temperature. Acts as your HLT — no third vessel.

Step 2

Mash

Pump recirculates wort from the Unitank through the grain bed in the DrainPro mash tun. Even, repeatable conversion.

Step 3 · optional

Lauter & sparge

Wort drains from the mash tun back to the Unitank through the sloped bottom drain.

Step 4

Boil

Unitank brings wort to a rolling boil — sanitizing the vessel completely before fermentation. No chemical sanitizer.

Step 5

Chill

Cool through the Unitank jacket using tap water or the optional glycol chiller for faster, more precise cooling.

Step 6

Ferment & package

Dump trub through the conical. Pitch yeast. Ferment under pressure with stable temperature control. Pressure transfer to keg.

Technical specifications

1 BBL specs.

Fermenter

150 L (39 gal) jacketed conical Unitank · 50 cm (19.7") Ø × 140 cm (55.1") H · top port 155 cm (61") H

Mash tun

50 gal DrainPro mash tun · false bottom · hinged grain door

Brew volume

10 gal (38 L) – 32 gal (121 L) finished wort per batch

Voltage

240V single-phase - 30A breaker
Electrical requirements →

Controllers

SV2 electric brewery controller (hot side: mash + boil) · cold-side temperature controller for fermentation — independent panels so you can brew batch 2 while batch 1 ferments

Pressure rating

Vessel 30 psi working pressure (2 bar) · jacket 5 psi · supports closed transfers, spunding, in-vessel carbonation

Plumbing

Tri-clamp throughout (1.5", 2", 3", 8")

Footprint

~3' × 6' floor space · Optional 24"x24" brew table and fermenter

Lead time

Made to order · ships in 3–10 days from our Vancouver, BC workshop

Warranty

2 years on stainless · 1 year on electronics and probes · lifetime parts support

What to expect

Order to first brew.

In stock in Vancouver, BC. Most orders ship in 3–5 business days. Live commissioning support is included so day-of-arrival is plug, plumb, brew.

Day 0 Order placed

Order placed

ATC checkout, or book a 15-min call first if you want voltage/cooling guidance before you commit.

Days 1–5 Picks & ships

Picks & ships

Pulled from inventory, crated for freight, US tariffs and duties paid by us. Tracking and delivery appointment booked direct with carrier.

Delivery Plug & plumb

Plug & plumb

Unbox, set the vessels, plumb cold water (or glycol), wire to your 240V circuit. Most installs take an afternoon.

First brew Live commissioning call

Live commissioning call

30–60 min video call covering first water-test, controller setup, and first-brew checklist. Included with every 1 BBL.

Verified reviews

What our customers are saying

Real reviews from real brewers — pulled live from Judge.me.

Customer Reviews

Based on 7 reviews
100%
(7)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
L
Lacy Layne
Awesome customer service

We are scaling up our kombucha brewery to meet demand. The Unibrau Pro is perfect for a small startup. The equipment is commercial grade, customizable, and support has been amazing. Steven worked with me via a video call to set our system up specifically for kombucha. What a great company!

R
Ricky Lee
This is pretty cool

I'm still learning to use it , but I'm very happy with it.

Thanks Ricky, keep us updated with your progress using the system!

D
Dan Lowrance
Extremely versatile choice for a pilot system in a small brewery startup

Homebrew background, small brewery startup, space is very, very tight. I was enticed by the novel, compact 2-vessel design, a little nervous of the investment, impressed with the pro quality as a pilot system, and continually grateful of the versatility of the hardware around the brewery.
I bought this 30g system while waiting for my 5BBL brewhouse to arrive, with the intent to get some pilot batches going for recipe development. This arrived, but I had a lot of work to do on the brewery, so I've only brewed on it a few times so far. In my case, for those few times this was a perfect system to transition from homebrew to pro-brew as it really is a small pro-brew setup. The value of the kit really showed with an abundance of valves, clamps, ferules, pumps, custom fittings, piping, the vessels, all of which I have used and needed for my larger brewhouse as well. The 30g mash tun has become a wort grant/hop back, when not used for running a caustic loop cleaning a vessel. The panel came with the functionality of controlling additional fermentation vessels, which was a consideration...but this morning I'm nervously shopping for a yeast brink, and realized that I already have one, a jacketed one at that! Go ahead and get a quote for a 1BBL jacketed yeast brink, and you will realize this system will easily pay for itself for a small brewery.
Thanks Steven for putting this well-though-out package together as a quality small pro-brew setup. It is absolutely all that and hardware continues to play an invaluable around my brewery.

M
Michael E.
Impressions of Unibrau Pro V2 Brew System

This complete brewing system is very well thought out. Comes with everything you need from mashing in to filling a korny keg. Components are top notch and finishes are mirror bright where needed (inside fermenter). I'm finishing fermenting my first batch now. It's in a cold shop so I'm using the heater (set at 5%) to cycle on and off occasionally to control fermentation temperature. It works great. I'm sure cooling using the included gear will work well too. I'll really end up with a glycol chiller since I don't have a source of water near my electrical connection.

A couple of things to note. I was making a 10 gallon finished beer batch (2 corny kegs) so I HAD 10.5 gallons in the fermenter to account for trub in the cone while I rack the beer. I used the anti siphon air lock. Worked well for first day or so. Checked on the second day and there was true, foam and wort all over as the airlock exploded off the fermenter. Switched to a blow off tube (it would be nice if a tri clamp fitting with a hose barb was included for this purpose) and the problem was solved. One additional comment is that even though I have cold water (mid 40s I'd guess), it takes quite awhile to cool 10.5 gallons of wort from boiling to yeast pitching temperature, especially if you're used to a high efficiency counterflow heat exchanger. On the other hand, there's no risk of plugging. One note is that I used a BIAB bag (The Brew Bag) in the mash tung. Probably not needed, but I like to mill my grain quite fine for good utilization and the suits on the mash plate seem kind of big to me. Maybe it's just a holdover from my days of plugging counterflow exchangers. Finally the included hop basket has a pretty coarse mesh. I switched out during the first hop addition to one I have with finer mesh. Again, probably just old brew technique habit since there really is nothing to plug up on this system.

Delivery took quite awhile, but as Steven pointed out it's a big order and the supply chain is pretty messed up right now.

Steven even took time out on a Saturday to call me and clarify a few things when I was assembling the gear.

M
Michael E.
Impressions of Unibrau Pro V2 Brew System

This complete brewing system is very well thought out. Comes with everything you need from mashing in to filling a korny keg. Components are top notch and finishes are mirror bright where needed (inside fermenter). I'm finishing fermenting my first batch now. It's in a cold shop so I'm using the heater (set at 5%) to cycle on and off occasionally to control fermentation temperature. It works great. I'm sure cooling using the included gear will work well too. I'll really end up with a glycol chiller since I don't have a source of water near my electrical connection.

A couple of things to note. I was making a 10 gallon finished beer batch (2 corny kegs) so I HAD 10.5 gallons in the fermenter to account for trub in the cone while I rack the beer. I used the anti siphon air lock. Worked well for first day or so. Checked on the second day and there was true, foam and wort all over as the airlock exploded off the fermenter. Switched to a blow off tube (it would be nice if a tri clamp fitting with a hose barb was included for this purpose) and the problem was solved. One additional comment is that even though I have cold water (mid 40s I'd guess), it takes quite awhile to cool 10.5 gallons of wort from boiling to yeast pitching temperature, especially if you're used to a high efficiency counterflow heat exchanger. On the other hand, there's no risk of plugging. One note is that I used a BIAB bag (The Brew Bag) in the mash tung. Probably not needed, but I like to mill my grain quite fine for good utilization and the suits on the mash plate seem kind of big to me. Maybe it's just a holdover from my days of plugging counterflow exchangers. Finally the included hop basket has a pretty coarse mesh. I switched out during the first hop addition to one I have with finer mesh. Again, probably just old brew technique habit since there really is nothing to plug up on this system.

Delivery took quite awhile, but as Steven pointed out it's a big order and the supply chain is pretty messed up right now.

Steven even took time out on a Saturday to call me and clarify a few things when I was assembling the gear.

Common questions

About the 1 BBL system.

Will I be charged anything at the border?+

No. Every US order ships fully duty-paid. We clear it and prepay the duties, tariffs and brokerage before it ships, and the courier delivers it like a domestic parcel. The price you see is the price you pay.

Our guarantee: if you're ever charged import duties or fees on a Bräu Supply order, send us the receipt and we refund them, no questions.

Alaska, Hawaii and international orders are quoted before you buy — contact us.

How is the 1 BBL different from the BräuPro 20G?+

Bigger vessels, same workflow. The 1 BBL doubles your batch (10–32 gal vs 5–20 gal) with a proper 40 gal jacketed Unitank instead of the smaller fermenter. Same two-vessel architecture, same tri-clamp parts ecosystem, same SV2 hot-side controller + cold-side temperature controller. If you're already maxing out a 20G and want headroom — or want a real pilot setup for kombucha, mead, or pro beer R&D — this is the next step.

Do I need the glycol chiller, or is tap water enough?+

Tap water works for ales fermented at 60–70°F when your cold tap supply runs colder than the set point — fine for most North American homebrew setups. Glycol is required for lagers, year-round temperature stability, and faster crash cooling. You can also add it later — the base system is already glycol-ready, and the glycol kit drops in.

Is 1 BBL enough to run a taproom or nano brewery?+

For the right operation, yes. Two batches per week sustains a single house tap with rotation. Most successful 1 BBL operators run 4–8 batches a week across multiple beers. It's not a 5 BBL system — but it's enough to prove demand and validate a brand before scaling up. If you know you need 3+ BBL out of the gate, see the 3 & 5 BBL waitlist. More on sizing a first brewhouse: pilot brewing systems, 5 gallons to 1 BBL.

What power do I need?+

240V single-phase, dedicated circuit for the standard config — same as a North American electric range. We'll confirm the exact circuit requirement during the spec call before shipping. Sub-panel and circuit work is your local electrician's job; we provide the load sheet they need.

What's the 15-min call for?+

Quick voltage / cooling / space-fit check before you commit. Not a sales pitch. Most callers want to confirm 240V availability, decide between tap-water and glycol for their environment, or talk through how it fits the space they have. 15 minutes is enough for any of those. Book it if you want it — skip it and order if you don't.

Is there a manual?+

Yes, two. The BräuPro manual (PDF) covers setup, safety, the controllers, the pump and recirculation, brew day step by step, and cleaning. The fermenter has its own Unitank operation, cleaning and safety manual (PDF) for the PRV, preventing vacuum collapse, carbonation and transfers. The assembly and brew-day videos are on the Learn page.

What's the warranty and parts story?+

2 years on the stainless: the vessel, every weld and TC port, grain baskets, brew tables and stainless fittings.

1 year on electronics: controllers, pumps, heating elements, solenoid valves and temperature probes, whether they come with a system or are bought on their own. Not covered on elements: dry-firing (running the element without liquid covering it), and heat or melt damage at the twist-lock plug from a loose or improper connection — a proper, fully seated connection has to be maintained.

Gaskets, clamps and O-rings are consumables; replacements are in stock and cheap. Warranty replacement parts are free, and we bill the shipping at cost. If we need the faulty part back, we send you a prepaid label.

Lifetime parts support on everything we build — serviced, not replaced. Orders placed before October 8, 2026 keep the warranty terms they were sold with.

Still have questions? Talk to a brewer, not a sales rep. Email or call us during US business hours.
Book a 15-min call

Ready to brew at 1 BBL?
Ships in days.

In stock in Vancouver, BC. Most orders ship in 3–5 business days. Live commissioning call included.