MCED BEF-300 industrial glycol chiller
MCED · Industrial Series · BEF-300 / 500 / 800 / 1000 · QUOTE

MCED Industrial Glycol Chiller

Industrial glycol chillers for production cellars: the 3.25 HP BEF-300 (28,500 BTU/hr) and 5 HP BEF-500 (46,000 BTU/hr), or two units on one BFT-67 as the BEF-800 and BEF-1000. Hardwired 220V single phase. Priced per build.

Est. 2014
✓
⚡ 220V single-phase hardwired install — both models are NOT plug-in. They wire directly to a 50A (BEF-300) or 70A (BEF-500) circuit with an external disconnect. A licensed electrician is required for hookup. Most commercial cellars already have this infrastructure or budget for it as part of buildout.

MCED's industrial glycol chillers for production cellars. The BEF-300 (3.25 HP, 28,500 BTU/hr) and BEF-500 (5 HP, 46,000 BTU/hr) run straight line or on the BFT-67 67-gallon reservoir. Two units on one BFT-67 make the BEF-800 (a BEF-300 + BEF-500) or the BEF-1000 (two BEF-500s). Outdoor versions of the BEF-300 and BEF-500 are also available.

Hardwired 220V single phase, connected by an electrician. Priced per build: tell us your fermenters and cellar, and we size it and quote it.

Step 1 — Choose your size BEF-300
Priced per build Model, indoor or outdoor unit, reservoir, pump count and freight change the price. Tell us your setup and we reply within one business day.
→
Ready to ship · most orders out in under a week
2y
2-year warranty · lifetime parts · every part replaceable
✉
Talk to a brewer, not a sales rep · email or call — real humans
Step 2 — Reservoir configuration

Straight line, or on the BFT-67.

These units run either straight line, without a reservoir, or sitting on MCED's BFT-67 67-gal reservoir, which takes up to 10 pumps. The BEF-800 and BEF-1000 are two units on one BFT-67. Decide here; it goes into your quote.

What industrial install looks like

Industrial installs need a real electrician and brewery contractor.

The Industrial Series is engineered for breweries that already have a commercial cellar — concrete floor, 220V single-phase service available, drain in the floor for glycol flush. We don't install — but we'll send your electrician the schematic and your brewery contractor the plumbing diagram, and walk both through it on a call before the unit ships.

  • Licensed electrician — 50A circuit + disconnect for BEF-300, 70A for BEF-500 (we send the schematic before the unit ships)
  • Brewery contractor — glycol manifold + insulated trunk to fermenters (we send the plumbing diagram and walk through it on a call)
  • ~half a day on-site — typical install if the 220V circuit is already there; full day if a new circuit needs to be pulled
  • Lead time 4–8 weeks made-to-order — LTL palletized + white-glove curbside drop
Sizing & compatibility

What the Industrial Series will cool.

Run them straight line or on the BFT-67 67-gallon reservoir. Two units on one BFT-67 make the BEF-800 or BEF-1000. Outdoor versions of the BEF-300 and BEF-500 are also available and pair the same way.

BEF-300

20 BBL hall

6–12 BBL fermenters

Comfortably runs a 20 BBL production hall with 6–12 fermenters under typical brewery duty (ales + occasional lagers). 3.25 HP compressor, 28,500 BTU. Pair with BFT-67 + 6 pumps for the standard install.

3.25 HP · 50A
BEF-500

40 BBL hall

10–20 BBL fermenters

For 40 BBL halls running 10–20 fermenters, or smaller halls with regular lager pull-downs. 5 HP compressor, 46,000 BTU/hr. Pair with a BFT-67 and up to 10 pumps; add a second unit on the same BFT-67 to make a BEF-1000.

5.0 HP · 70A
Paired units

BEF-800 · BEF-1000

2 units on one BFT-67

BEF-800: a BEF-300 and a BEF-500 on one BFT-67, about 74,500 BTU/hr combined. BEF-1000: two BEF-500s, about 92,000 BTU/hr. Two units also keep you cooling if one is down for service.

See BFT-67 →
Technical specifications

Specs by model.

Specs for:
Cooling capacity

28,500 BTU/hr · evap 25°F, ambient 90°F

Compressor

3.25 HP hermetic

Refrigerant

R448

Voltage

220V · 60Hz · single phase

Electrical install

Hardwired — wired by an electrician with an external disconnect (no plug)

Min circuit ampacity

31.8A · max fuse 50A · compressor RLA 23.2A

Controller

Chiller Watch built in · cloud-connected

Dimensions

35" W × 25" D × 20" H (chiller alone) · 45" H (with reservoir) · 242 lb dry

Reservoir compatibility

Pairs with BFT-67 (67 gal) for centralized cooling · supports 2 chiller decks per BFT-67

Base price

Quote-based PRE-QUOTE · request a quote for chiller + reservoir + freight

US
Free shipping to the lower 48 over $600Delivered price · no customs, no surprises
2y
2-year warranty · lifetime partsEvery part replaceable
14
Hand-built in Vancouver, BCSince 2014 · we invented the single-vessel electric brewhouse
✉
Talk to a brewer, not a sales repReal humans · email or call
Common questions

About the Industrial Series.

Will I be charged anything at the border?+

No. Every US order ships fully duty-paid. We clear it and prepay the duties, tariffs and brokerage before it leaves Vancouver, and the courier delivers it like a domestic parcel. The price you see is the price you pay.

Our guarantee: if you're ever charged import duties or fees on a Bräu Supply order, send us the receipt and we refund them, no questions.

Alaska, Hawaii and international orders are quoted before you buy — contact us.

Why is pricing quote-based instead of listed?+

Three reasons. (1) Industrial chillers ship LTL with significant freight + brokerage variation by region — quoting at checkout would either overcharge half our buyers or undercharge the other half. (2) Most cellars buy the chiller alongside the BFT-67 reservoir, a custom plumbing manifold, and a recommended electrician spec — packaging that as one quote is the right shape. (3) Production-tier and below are commodity SKUs; Industrial-tier is a project we want to walk through with you. Submit the form and we'll come back within 48 hours.

BEF-300, BEF-500, BEF-800 or BEF-1000?+

By peak load. BEF-300: 28,500 BTU/hr, around a 20 BBL hall running mostly ales. BEF-500: 46,000 BTU/hr, around a 40 BBL hall, or smaller halls running back-to-back lager crashes. BEF-800 (BEF-300 + BEF-500) and BEF-1000 (two BEF-500s) run on one BFT-67 for bigger loads or a built-in backup. Send us your fermenter list and we size it in the quote.

Do I need the BFT-67 reservoir?+

No. These units also run straight line, without a reservoir. Most production halls add the BFT-67 (67 gal) because (1) more thermal mass means a steadier supply temperature under variable demand, (2) it takes up to 10 pumps, one per fermenter, and (3) it takes a second unit, which is how the BEF-800 and BEF-1000 are built.

What does the electrician actually need to do?+

Run a 220V single-phase circuit to the chiller location — 50A breaker + disconnect for BEF-300, 70A for BEF-500. Wire the chiller's terminal block to that disconnect (no plug, no whip). We send the schematic to your electrician before the unit ships. Typical half-day install if the panel + circuit is already there; full day if a new circuit needs to be pulled. Your brewery contractor handles the glycol manifold + insulated trunk separately.

Can I add a second chiller deck later?+

Yes. The BFT-67 takes two chiller units. Start with one BEF-300 or BEF-500 on a BFT-67, then add a second unit later to make a BEF-800 or BEF-1000 when you grow.

Why isn't glycol included?+

Industrial-scale glycol fills are typically 30–50 gal of pre-mixed propylene — that's a hazmat freight class on its own. Easier and cheaper for you to buy bulk from a regional HVAC supplier. Food-safe propylene only (never ethylene). Mix to ~30% propylene of total system volume — that's the reservoir (built-in or 67 gal) plus all your fermenter jackets and the connecting glycol trunk. We send a fluid-volume calculation as part of the quote.

Shipping & lead time?+

4–8 weeks from order — Industrial chillers are made-to-order with the reservoir + pump count + voltage spec configured per quote. Ships LTL palletized with a delivery appointment and white-glove curbside drop. Free shipping to the lower 48; delivered price, no customs, no surprises.

Warranty & service?+

1-year warranty on the refrigeration loop, direct through MCED Systems. Our role is fulfillment, install support and tech triage; warranty repairs go through MCED.

Still have questions? Talk to a brewer, not a sales rep. Email or call us during US business hours.

20–40 BBL hall.
Quote-based. White-glove install.

MCED Industrial Series — commercial chillers for production breweries. Made-to-order in 4–8 weeks. Manufactured in Canada by MCED. 1-year warranty, priority service.