Straight line, or on the BFT-67.
These units run either straight line, without a reservoir, or sitting on MCED's BFT-67 67-gal reservoir, which takes up to 10 pumps. The BEF-800 and BEF-1000 are two units on one BFT-67. Decide here; it goes into your quote.
Industrial installs need a real electrician and brewery contractor.
The Industrial Series is engineered for breweries that already have a commercial cellar — concrete floor, 220V single-phase service available, drain in the floor for glycol flush. We don't install — but we'll send your electrician the schematic and your brewery contractor the plumbing diagram, and walk both through it on a call before the unit ships.
- Licensed electrician — 50A circuit + disconnect for BEF-300, 70A for BEF-500 (we send the schematic before the unit ships)
- Brewery contractor — glycol manifold + insulated trunk to fermenters (we send the plumbing diagram and walk through it on a call)
- ~half a day on-site — typical install if the 220V circuit is already there; full day if a new circuit needs to be pulled
- Lead time 4–8 weeks made-to-order — LTL palletized + white-glove curbside drop
What the Industrial Series will cool.
Run them straight line or on the BFT-67 67-gallon reservoir. Two units on one BFT-67 make the BEF-800 or BEF-1000. Outdoor versions of the BEF-300 and BEF-500 are also available and pair the same way.
20 BBL hall
6–12 BBL fermentersComfortably runs a 20 BBL production hall with 6–12 fermenters under typical brewery duty (ales + occasional lagers). 3.25 HP compressor, 28,500 BTU. Pair with BFT-67 + 6 pumps for the standard install.
3.25 HP · 50A40 BBL hall
10–20 BBL fermentersFor 40 BBL halls running 10–20 fermenters, or smaller halls with regular lager pull-downs. 5 HP compressor, 46,000 BTU/hr. Pair with a BFT-67 and up to 10 pumps; add a second unit on the same BFT-67 to make a BEF-1000.
5.0 HP · 70ABEF-800 · BEF-1000
2 units on one BFT-67BEF-800: a BEF-300 and a BEF-500 on one BFT-67, about 74,500 BTU/hr combined. BEF-1000: two BEF-500s, about 92,000 BTU/hr. Two units also keep you cooling if one is down for service.
See BFT-67 →Specs by model.
28,500 BTU/hr · evap 25°F, ambient 90°F
3.25 HP hermetic
R448
220V · 60Hz · single phase
Hardwired — wired by an electrician with an external disconnect (no plug)
31.8A · max fuse 50A · compressor RLA 23.2A
Chiller Watch built in · cloud-connected
35" W × 25" D × 20" H (chiller alone) · 45" H (with reservoir) · 242 lb dry
Pairs with BFT-67 (67 gal) for centralized cooling · supports 2 chiller decks per BFT-67
Quote-based PRE-QUOTE · request a quote for chiller + reservoir + freight
46,000 BTU/hr · evap 25°F, ambient 90°F
5.0 HP hermetic
R448
220V · 60Hz · single phase
Hardwired — wired by an electrician with an external disconnect (no plug)
43.3A · max fuse 70A
Chiller Watch built in · cloud-connected
35" W × 25" D × 27" H (chiller alone) · 52" H (with reservoir) · 300 lb dry
Pairs with BFT-67 (67 gal) for centralized cooling · supports 2 chiller decks per BFT-67
Quote-based PRE-QUOTE · request a quote for chiller + reservoir + freight
74,500 BTU/hr combined · a BEF-300 + BEF-500 on one BFT-67
3.25 HP + 5.0 HP
R448
220V · 60Hz · single phase
Hardwired — wired by an electrician with an external disconnect (no plug)
Wired as two units: BEF-300 (31.8A min ampacity, 50A max fuse) and BEF-500 (43.3A min ampacity, 70A max fuse)
Chiller Watch built in · cloud-connected
Two units on a BFT-67 (41" W × 29" D bath)
BFT-67 (67 gal) · up to 10 pumps
Quote-based PRE-QUOTE · request a quote for chiller + reservoir + freight
92,000 BTU/hr combined · two BEF-500s on one BFT-67
2 × 5.0 HP
R448
220V · 60Hz · single phase
Hardwired — wired by an electrician with an external disconnect (no plug)
Wired as two BEF-500 units (43.3A min ampacity, 70A max fuse each)
Chiller Watch built in · cloud-connected
Two units on a BFT-67 (41" W × 29" D bath)
BFT-67 (67 gal) · up to 10 pumps
Quote-based PRE-QUOTE · request a quote for chiller + reservoir + freight
Other chillers in the MCED lineup.
Production (BEF-100/-150) is the 220V plug-in tier — same form factor without the hardwire requirement. BFT-67 reservoir is the standard pairing for Industrial. Or see the full lineup.
MCED Production Glycol Chiller
BEF-100 and -150: 8,179–12,900 BTU/hr on 220V for bigger cellars.
MCED BFT-67 Glycol Buffer Tank
67 gal glycol reservoir for up to 10 pumps. Pairs with the BEF-04 and larger.
MCED High Capacity Glycol Chiller
BEF-04, -05 and -075: 3,481–6,180 BTU/hr, 17 gal bath, up to 4 pumps, Chiller Watch built in.
Unitank 1BBL
The 1 BBL jacketed Unitank for pilot batches and taprooms. Pressure-capable, tri-clamp throughout.
About the Industrial Series.
Will I be charged anything at the border?+
No. Every US order ships fully duty-paid. We clear it and prepay the duties, tariffs and brokerage before it leaves Vancouver, and the courier delivers it like a domestic parcel. The price you see is the price you pay.
Our guarantee: if you're ever charged import duties or fees on a Bräu Supply order, send us the receipt and we refund them, no questions.
Alaska, Hawaii and international orders are quoted before you buy — contact us.
Why is pricing quote-based instead of listed?+
Three reasons. (1) Industrial chillers ship LTL with significant freight + brokerage variation by region — quoting at checkout would either overcharge half our buyers or undercharge the other half. (2) Most cellars buy the chiller alongside the BFT-67 reservoir, a custom plumbing manifold, and a recommended electrician spec — packaging that as one quote is the right shape. (3) Production-tier and below are commodity SKUs; Industrial-tier is a project we want to walk through with you. Submit the form and we'll come back within 48 hours.
BEF-300, BEF-500, BEF-800 or BEF-1000?+
By peak load. BEF-300: 28,500 BTU/hr, around a 20 BBL hall running mostly ales. BEF-500: 46,000 BTU/hr, around a 40 BBL hall, or smaller halls running back-to-back lager crashes. BEF-800 (BEF-300 + BEF-500) and BEF-1000 (two BEF-500s) run on one BFT-67 for bigger loads or a built-in backup. Send us your fermenter list and we size it in the quote.
Do I need the BFT-67 reservoir?+
No. These units also run straight line, without a reservoir. Most production halls add the BFT-67 (67 gal) because (1) more thermal mass means a steadier supply temperature under variable demand, (2) it takes up to 10 pumps, one per fermenter, and (3) it takes a second unit, which is how the BEF-800 and BEF-1000 are built.
What does the electrician actually need to do?+
Run a 220V single-phase circuit to the chiller location — 50A breaker + disconnect for BEF-300, 70A for BEF-500. Wire the chiller's terminal block to that disconnect (no plug, no whip). We send the schematic to your electrician before the unit ships. Typical half-day install if the panel + circuit is already there; full day if a new circuit needs to be pulled. Your brewery contractor handles the glycol manifold + insulated trunk separately.
Can I add a second chiller deck later?+
Yes. The BFT-67 takes two chiller units. Start with one BEF-300 or BEF-500 on a BFT-67, then add a second unit later to make a BEF-800 or BEF-1000 when you grow.
Why isn't glycol included?+
Industrial-scale glycol fills are typically 30–50 gal of pre-mixed propylene — that's a hazmat freight class on its own. Easier and cheaper for you to buy bulk from a regional HVAC supplier. Food-safe propylene only (never ethylene). Mix to ~30% propylene of total system volume — that's the reservoir (built-in or 67 gal) plus all your fermenter jackets and the connecting glycol trunk. We send a fluid-volume calculation as part of the quote.
Shipping & lead time?+
4–8 weeks from order — Industrial chillers are made-to-order with the reservoir + pump count + voltage spec configured per quote. Ships LTL palletized with a delivery appointment and white-glove curbside drop. Free shipping to the lower 48; delivered price, no customs, no surprises.
Warranty & service?+
1-year warranty on the refrigeration loop, direct through MCED Systems. Our role is fulfillment, install support and tech triage; warranty repairs go through MCED.
20–40 BBL hall.
Quote-based. White-glove install.
MCED Industrial Series — commercial chillers for production breweries. Made-to-order in 4–8 weeks. Manufactured in Canada by MCED. 1-year warranty, priority service.